×

Bathroom Remodel Project Done on May 12, 2021

Primary Service: Bathroom Remodel

Other Services:

  • Quality Bathroom Countertops
  • Update Cabinetry
  • Shower Remodel
  • Install a Toilet
  • Interior Remodeling

Zip Code: 32256
City: Jacksonville
Neighborhood: Windy Hill
Date: May 12, 2021

Description of Work:

  1. Demolishing of existing, garden tub, tub surround, vanities, tops, lights and flooring to be performed by homeowner. Water source to garden tub and vanity sinks will need to be capped. We do not have this in our scope of work. If you need us to bring in a plumber, we will be happy to bring one in.  
  2. American Home Remodeling and Restorations will not be responsible for any electrical work. Electrical  work to be handled by homeowner hired contractor.  
  3. American Home Remodeling and Restorations will be responsible for demolishing, shower, shower  walls and shower soffit that extends to ceiling only. Demolished ceiling will be framed and patched with drywall.  
  4. Provide and install framing for new 40-inch wide by 10-feet tall wall to ceiling at back left bathroom corner that once housed a vanity. To right of new 40-inch wall we will create a 40-inch deep by 40- inches wide by 91-inches tall (ceiling height) opening, the total height of wall will be 96-inches. This  will house new home owner supplied ultra-violet sauna creating a new larger shower foot-print to the  left of sauna. New wall will be utilized for housing sauna on one side and shower wall on the other  side. Sauna side wall will receive dry-wall and shower side of wall to receive cement board and tile.  
  5. We will have to chip out concrete to bring sanitary to new location for new linear drain. 
  6. Existing sunken shower pan will be fill be filled in approximately 2 to 3-inches with concrete to bring  floor up high enough to install new shower pan. New shower pan will bring shower floor flush with  current bathroom floor height.  
  7. Provide and install new sloped shower pan. Shower pan to be slopped in one direction from right to  left for water to drain into new linear drain.  
  8. Provide and install new framing for new ceiling to enclose new shower foot-print. Shower ceiling will  be attached to new 40-inch by 10-foot wall and existing left side wall and 91-inches in height. This will  enclose new larger shower foot-print. Total height of new ceiling to be 96-inches in height. Leaving a  2-foot space to ceiling.  
  9. At front of new shower stall, we will provide and install new 42-inch half walls coming off new 4-foot  by 10-feet tall wall at an angle to enclose new shower foot-print leaving one 27-inch-wide entry door  opening to the far left. Half walls and shower entry way to receive new custom 3/8-inch-thick glass  shower enclosure with door.  
  10. Provide and install new moisture resistant cement backer board at 3 shower walls, half walls and  ceiling.  
  11. Provide and install new shower bench seat (location T.B.D.).  
  12. Provide and install new niche in shower wall as space allows location T.B.D. 
  13. Provide and install new porcelain tile at a 91-inch height on (3) three shower walls, ceiling, half walls  and shower floor incorporating a decorative waterfall band on one wall.  
  14. Prep bathroom floor area ready to accept new porcelain tile.  
  15. Provide and install new porcelain tile at bathroom floor.
  16. Provide and install new quarter round at bathroom floors.  
  17. Provide and install one shower head and handle complete. Shower head height T.B.D. Shower head location T.B.D.  
  18. Provide and install two new 48-inch-wide vanities each consisting of cabinets with drawers, doors,  and one connected bench seat that separates the two vanities. Each vanity to have one sink. The  bench seat will have one drawer.   
  19. Provide and install new granite or quartz tops for vanity area.  
  20. Scrape, patch and prep ceilings affected by construction ready to accept new knock down finish.  American Home Remodeling and Restorations will do our best to match the existing texture at  patched area with the rest of the ceiling texture. The newly textured area may look like a patch.  
  21. Prep all walls and ceilings in bathroom area affected by construction to accept two (2) coats of  Sherwin-Williams paint (color T.B.D.).  
  22. Remove and re-seat existing master toilet after tile is installed. 

Get in Touch

To set up a free consultation or to contact us with any questions please fill out the form to the right.

Call: (904) 646-6476







    Website created and supported by Exigo Sales and Marketing.